Project Support for the North Terminal Development (NTD) Baggage Handling System Modification to the Inline Check Baggage Inspection System (CBIS)
Our BHS Team is set to upgrade the existing Transportation Security Administration (TSA) screening equipment, including explosion detection system (EDS).
We will provide Pre-Construction Project Support, collaborating with BHS Designers and Stakeholders for Schematic, 30%, 60%, 90%, and 100% design submittal packages. Our services encompass QAQC, participation in design meetings, and acting as the Owner’s technical expert. The project is segmented into East, Central, West, Cruise, and FIS matrices, each comprising CTX 9400 EDS machine CBIS and associated CBRA. Additionally, Construction Support services are proposed for seamless project execution during the construction phases as directed by MDAD.
Key challenges include intricate system upgrades and coordination with multiple stakeholders. Our solution involves meticulous Pre-Construction Project Support, encompassing detailed reviews at each design phase (Schematic, 30%, 60%, 90%, and 100%), QAQC, and active participation in design meetings. This approach ensures a comprehensive understanding of the existing system and historical project context.
Benefits of Our Solution:
-
Thorough QAQC: Our team conducts rigorous quality checks at every design phase, guaranteeing the reliability and functionality of the upgraded systems.
-
Stakeholder Collaboration: Close coordination with BHS Designers, Stakeholders, and Airlines ensures a harmonized approach, minimizing potential disruptions during construction.
-
Expert Construction Support: Our Construction Support services offer a seamless execution phase, with our team providing on-site assistance as directed by MDAD.
We are eager to bring our expertise to this project, confident that our dedication will lead to a successful and efficient upgrade of the TSA screening equipment.